POWER GENERATION

POWER GENERATION

Image_not_found

POWER GENERATION

We design rotating machines that comply with global standards and certifications, including but not
limited to IEC, NEMA, API, CSA, Lloyds, DNV, ABS, BV, RMRS, ATEX, IEC ExN,
ExP. Zone 1 or 2 and Division 1 or 2 are also available. GE manufacturing facilities are ISO 9001
certified. Every machine is tested in our global state-of-the-art facilities to your exacting requirements.
GE has one of the largest capacities for full load testing.

Proven experience, quality service and honest impartial advice! 95% of our clients are derived from word of mouth referrals. Our quality of work and customer service is second to none and is proven by the fact that our customers have the belief and confidence to refer us to others. This statistic alone sets us apart from our competitors.

The generator is bilateral and the power turbine and steam turbine are so arranged as to putthe generator between them. The power turbine rotates fast at about 24,000rpm and, after the double reduction of speed to the generator’s 1,800rpm, is coupled through a one-way clutch. The steam turbine is of an existing type for marine use, while the power turbine also adopts the turbinetechnology of a likewise ubiquitous Mitsubishi MET turbocharger. The power turbine is installedon a common bed like the steam turbine unit, and the alignment between the steam turbine and thepower turbine is carefully checked at the time of factory shipment to prevent unbalances fromoccurring, because they are coupled by a high-speed revolving member. All necessary equipment, such as the lubrication system including an oil pump, is installed on a common bed and designed tobe pre-packaged to the greatest possible extent, thereby saving labor at the shipyard for its installation within the engine room.